Express Web Content Viewer (JSR 286)
- ${title}
don mouth naturalization and port lands flood protection

A New Mouth of the Don River, a new Community for Toronto
The Port Lands Flood Projection Project is about taking action to protect Toronto’s southeastern downtown area. Right now, in an extreme weather event, floodwaters from the Don River would overwhelm portions of the Port Lands, South Riverdale and Leslieville. Our plan is to reconnect the Don River to Lake Ontario by creating a naturalized river mouth. To do this we are embarking on one of the biggest infrastructure projects in Toronto’s history.
For more information about the planning and future development of the Port Lands and the Don Mouth Naturalization project, visit PortLandsTO.ca
project status
quick facts
DMNP EA Study Area boundaries: Eastern Avenue in the north, Ship Channel in the south, Inner Harbour in the west, and Don Roadway in the east
Proximity: 20 minute walk to downtown
What the naturalization of the mouth of the Don River will deliver:
- Over 1,000 m of new river channel
- 13 hectares of new coastal wetland, with a 2 hectare wetland patch adjacent to the Don Roadway connecting to the Ship Channel.
- 5 hectares of terrestrial habitat located within the constructed valley system with additional greenspaces anticipated outside the valley system
- Creation and enhancement of 14 hectares of aquatic habitat
Flood protection facts:
- 290 hectares of land are at risk due to flooding from the Don River, under a Hurricane Hazel-sized storm event
- The new Mouth of the Don River will remove the flood risk to 240 hectares of land. The majority of the remaining 50 hectares of land still at risk due to flooding are designed to be flooded as they are located within the Keating Channel and the new naturalized river valley system. The Don Valley Parkway will continue to flood north of Lake Shore Blvd to Eastern Avenue. The only solution to flooding of the DVP would be to rebuild this section of the highway, which is outside the project scope.
Design Teams:
- Port Lands Estuary Plan: Michael Van Valkenburgh Associates Inc.
To sign-up for Port Lands Flood Protection construction notices, please email info@waterfrontoronto.ca
related events
June 19-20, 2019
Public Information Centre: Port Lands Flood Protection
DETAILS
July 18, 2018
Port Lands Flood Protection Community Consultation
VIEW DETAILS
February 22, 2018
Community Consultation: Don Mouth Naturalization and Port Lands Flood Protection
VIEW DETAILS
November 18 , 2015
Public Workshop - Connecting the Port Lands and South of Eastern Areas
VIEW DETAILS
November 17 , 2015
Public Workshop - Placemaking in the Port Lands
VIEW DETAILS
November 14 , 2015
Port Lands Public Open House and Information Sessions
VIEW DETAILS
VIEW MORE MEETINGS
Related Documents:
- Board Book - Board of Directors Meeting - October 11, 2018
- Construction Notice - Port Lands Flood Protection - September 27, 2018
- Design Review Panel Meeting Minutes - September 26, 2018
- Design Review Panel Meeting Presentation - Port Lands Flood Protection Parks, River and Roads (DRAFT) - September 26, 2018
- Design Review Panel Meeting Presentation - Port Lands Flood Protection Detailed Design (DRAFT) - September 26, 2018
- Design Review Panel Meeting Agenda - September 26, 2018
- Notice of Commencement of Environmental Assessment - Broadview and Eastern Flood Protection Project - September 20, 2018
- Board Book - Finance, Audit and Risk Management Committee Meeting - September 20, 2018
- Design Review Panel Meeting Minutes - July 25, 2018
- Design Review Panel Meeting Presentation - Port Lands Flood Protection Bridges - Schematic Design (DRAFT) - July 25, 2018
multimedia
Take a tour of Toronto's Lower Don Lands
Watch to learn more about the revitalization of Toronto’s waterfront