water's edge promenade & boardwalk east

Torontonians and visitors may now enjoy the lakefront east of the Jarvis slip. A first stretch of water's edge promenade, a linear park connecting Canada's Sugar Beach with Sherbourne Common, is now open.
In the future, the granite promenade with its double row of trees will extend almost a full kilometre, all the way to the Parliament Slip.
Our goal is to create public space along the water's edge. Our ultimate vision is to build a linear park and 6-metre wide wooden boardwalk along the full length of East Bayfront, from Parliament Street to Jarvis slip.
The way people experience the water’s edge from either the promenade or boardwalk will be quite different. Along the promenade, a row of mature trees lining each side will create a French-style allée by the lake, sheltering pedestrians from sun and wind. The boardwalk, open to the elements, gives pedestrians full exposure to the lake.
integrated stormwater management system
In keeping with a commitment to sustainability and design excellence, Waterfront Toronto is constructing a stormwater management system in East Bayfront that will be integrated into the design of the area’s public realm, including Sherbourne Common. This integrated approach allows required stormwater infrastructure to be beautiful, functional, sustainable and cost-effective.
Read the Water's Edge Promenade fact sheet and East Bayfront stormwater management overview to learn more about how stormwater is collected and treated in East Bayfront.
learn more
accessibility features
The water's edge promenade is fully accessible to people with disabilities. The promenade features a flat, 10-metre wide granite surface swhose cobbles have been smoothed to ensure those in a wheelchair or those who have difficulty walking can navigate the area.
parliament wavedeck
At the eastern end of the promenade, Waterfront Toronto’s fourth wavedeck is planned for the Parliament Slip. This impressive 3000 square metre (32,300 square foot) wavedeck, just a five minute walk from the Distillery District, will be both a public gathering space and treatment area for East Bayfront’s stormwater management system. Several dramatic openings in the wavedeck will allow the community’s stormwater to undergo natural UV treatment as part of the water purification process.
related news
project status
quick facts
Location: At the water’s edge just east of Jarvis Street to the Parliament Slip
Lead Designers: West 8 + DTAH (promenade/boardwalk and wavedeck design); and The Municipal Infrastructure Group (stormwater management facility)
Size:
1 kilometre length
9.4 metre wide granite mosaic promenade
6-metre wide wooden boardwalk
The total width of the Water's Edge Promenade varies from 13-19 metres wide depending on the condition at each of the adjacent buildings.
Number of trees: Approximately 200
Related Documents:
- Waterfront Toronto Rolling Five-Year Strategic Plan 2021/22 - 2025/26
- Waterfront Toronto Virtual Town Hall Presentation - December 1, 2020
- Notice of Waterfront Toronto Virtual Town Hall - December 1, 2020
- Waterfront Toronto Integrated Annual Report 2019-20
- Design Review Panel Meeting Minutes - December 11, 2019
- Design Review Panel Meeting Presentation - East Bayfront Boardwalk and In-water Pipe (DRAFT) - December 11, 2019
- Design Review Panel Meeting Agenda - December 11, 2019
- Waterfront Toronto Rolling Five-Year Strategic Plan - 2020/21 - 2024/25
- Presentation: The Future of Waterfront Revitalization - Aspirational Projects - November 27, 2019
- Design Review Panel Meeting Minutes - October 23, 2019
multimedia
View the opening of the first phase of the Water's Edge Promenade
Watch to learn more about the revitalization of Toronto’s waterfront