Document library

Welcome to our archive of reports, studies, meeting notes, public presentations, and more. Search by document type or keyword to find what you're looking for.

Sort By:

Appendix 15: Marine Engineering Services to Develop Preliminary Designs for Land Creation Works Surrounding Essroc Quay (Riggs)

Appendix 14: Figures to Accompany CH2M Reports

Appendix 13: Environmental Cost Estimate (CH2M Report I)

Appendix 12: Earthworks Methodology (CH2M Report H)

Appendix 11: Preliminary Groundwater Management Plan (CH2M Report G)

Appendix 10: Integrated Soil Management Plan (CH2M Report F)

Appendix 9: Remediation and Treatment Options (CH2M Report E)

Appendix 8: Geotechnical Conditions (CH2M Report D)

Appendix 7: Regulatory Approach (Definition of RSC Areas) (CH2M Report C)

Appendix 6: Screening Level Risk Assessment (CH2M Report B)

Appendix 5: Conceptual Site Model (CH2M Report A)

Appendix 4: Final Environmental Assessment and Geotechnical and Earthworks Report: Executive Summary

Appendix 3: Port Lands Environmental, Geotechnical, and Hydrogeological Investigation (GHD)

Appendix 2: Due Diligence and Validation Documents (Plans) (MVVA)

Appendix 1: Lower Don River Due Diligence and Validation Report (MVVA)

Board and Committee Materials

Board Item 7 - Capital Approval for Bayside Phase 2 - 12-12-2016

Design Review Panel Materials

Design Review Panel Meeting Presentation - Port Lands Due Diligence - January 25, 2017

Design Review Panel Materials

Design Review Panel Presentation - Jack Layton Ferry Terminal Phase 1A - January 25, 2017

Design Review Panel Materials

Design Review Panel Meeting Presentation - Essroc Quay Lakefilling - January 25, 2017

Design Review Panel Materials

Design Review Panel Meeting Presentation - 300 Commissioners Street - January 25, 2017

Board and Committee Materials

Toronto Waterfront Revitalization Corporation Act, 2002

Environmental Assessment Materials

Notice of Submission of Gardiner East Environmental Assessment (January 27, 2017)

Biography - William Fleissig

Notice of Completion of Environmental Study Report - Project Under Gardiner Pedestrian and Cycling Bridge Crossing, Fort York Blvd (January 16, 2017)

Environmental Study Report - The Bentway (Project Under Gardiner) Municipal Class Environmental Assessment - January 16, 2017

Corporate and Annual Reports

Waterfront Toronto Annual Corporate Plan - 2017/18

Financial Statements

Management Report 2015/16