Awarded Contracts


Every year, a wide range of Canadian and international firms are awarded contracts with Waterfront Toronto to provide an array of goods and services.
 

As part of its commitment to transparent reporting, Waterfront Toronto posts all pre-qualifications and contracts with a value over $50,000 publicly. These contracts were awarded in accordance with Waterfront Toronto's procurement policy and are listed below. All contracts were competitively sourced, unless labeled otherwise.

 

Since inception, Waterfront Toronto has refrained from sole sourcing contracts. We continuously develop more rigorous policies than those required by governments to limit sole sourcing. Certain single sourced contracts awarded by Waterfront Toronto are for professional services as defined in the Procurement Policy. Please refer to Section 6 of our  Procurement Policy.

 

For its large construction projects valued over $5,000,000.00, Waterfront Toronto’s Director of Procurement and the COO determine a delivery and contracting methodology and fee structure.

 

construction management services

 

All chosen construction managers (CMs) are bound by Waterfront Toronto’s procurement policy. The CM is overseen by Waterfront Toronto and awards contracts on Waterfront Toronto’s behalf.
 

EllisDon Civil Ltd. is the firm providing construction management services for Port Lands Flood Protection and Enabling Infrastructure (PLFPEI) project.
 

PLFPEI is a seven-year, $1.25-billion effort to protect Toronto’s southeastern downtown from flooding and unlock the potential for new neighbourhoods and employment areas in the Port Lands Construction management services on this project involve:

 

  • Excavating a new mouth for the Don River in Toronto’s Port Lands area
  • Constructing major municipal infrastructure
  • Constructing significant parkland and natural greenspace

  

Master Design Work

 

To ensure that the waterfront projects deliver excellence in design, architecture and public space, Waterfront Toronto holds international design competitions and/or rigorous Request for Proposals processes to select design partners.

 

As a result of these competitions and processes, several world- renowned firms have been selected as "master designers" for waterfront precincts. In addition to the original design concept, the design partners are responsible for working with Waterfront Toronto on the ongoing planning and design phases of the project including any required work on environmental assessments.

 

  • West8 + DTAH, won the Central Waterfront Innovative Design Competition in 2006 for the central waterfront including East Bayfront and Queens Quay
  • Michael Van Valkenburgh Associates, who won the Lower Don Lands Design Competition in 2007, is our design partner for the Lower Don Lands which includes the Portlands Flood Protection.  
  • KPMB Architects, West 8 and Greenberg Consultants Inc. were selected as the winning entry for the Innovative Design Competition for the Jack Layton Ferry Terminal and Harbour Square Park in 2015. 
     

Audits

 

Waterfront Toronto is audited by various levels of government from time to time. Past audits found that Waterfront Toronto is compliant with all federal policies as well as with its own procurement policy.
 

In 2018, the procurement process was audited by the Auditor General. Recommendations were made in the report which Waterfront Toronto has taken every effort to ensure they are met and implemented in a timely manner.

 

Visit our Corporate Reporting page for more information regarding audits.

List of Awarded Contracts

Answer

March

  • Implementation and Support Services - Microsoft Dynamics 365 CRM Sales Module - 3 year term with option to extend 2 additional one-year terms – Betach Solutions Inc. ($147,076)
  • Offer to Connect for 62 Villiers Street in the East Bayfront – Toronto Hydro Electric System Limited ($138,497) (Sole Source)

 

February

Quayside Infrastructure and Public Realm Design in East Bayfront – WSP Canada Limited ($5,017,275)

Greenhouse Gas Accounting and Advisory on Climate-Related Disclosures for Waterfront Toronto – PricewaterhouseCoopers LLP ($72,686)

Project Management, Design Review, Engineering, Third Party Inspection and Audit Services for Lake Shore Boulevard East (LSBE) Bridge and Public Realm Project in Port Lands – Toronto Hydro Electric System Limited ($236,000)

Answer

 

December

  • Design Review Services for Port Lands Flood Protection Project Relocation/Reinstatement of Hydro Assets - Toronto Hydro Electric System ($264,386) (Sole Source)
  • Cherry Street Gas Main Relocation for Port Lands Flood Protection Project – Enbridge Gas Distribution ($1,549,735) (Sole Source)

 

November

  • Villiers Island Massing Study – DTAH ($62,526)
     

October

  • Water Service Connections from the Property line to the Watermain and Sewers for Love Park in Central Waterfront - The Treasurer, City of Toronto ($100,507) (Sole Source)
  • Design and Supply of Play Equipment Phase 1 for Port Lands Flood Protection Project
    • APE Studio Inc. ($409,136)
    • Earthscape Play Inc. ($465,660)
    • Monstrum APS ($416,931)
    • Whole Trees LLC ($210,880)
       

September

  • Relocation of Zayo Fibre Optic Cable at Lake Shore Boulevard East between Saulter St and Carlaw Ave - Zayo Group ($190,464) (Sole Source)
  • General Contractor for Queens Quay West Optimization in Central Waterfront - UCC Group Inc. ($900,654)
  • Bayside Child Care Centre Interior Fit-Out in East Bayfront - BDA Inc. ($2,329,100)
  • Villiers Island - Advisory Services for GHG and Energy Modelling, Optimization and Low Carbon Strategy - Sustainability Solutions Group ($76,090)
  • External Audit Services for Waterfront Toronto - 3-year contract with options to renew two additional 1-year term - BDO Canada LLP ($196,500)
  • Implementation and Support Services - Microsoft Dynamics 365 Human Resources Module - Brightpoint Infotech ($120,450)
     

August

  • Villiers Island - Infrastructure Due Diligence and Class D Cost Estimate - WSP Canada Inc. ($477,188)
  • Villiers Island Project Management Consultant - Tablino Consulting Inc. ($1,688 per week as and when required) (Sole Source)
  • Diversity, Equity, and Inclusion Programs Consulting Services - MNP LLP ($91,476)
     

July

  • Contribution to Parking Lot Construction in Port Lands - Toronto Waterfront Development Studio Inc. ($75,000) (Sole Source)
  • The Bentway Phase 1B Construction Services Project - Concrete retaining wall, steel panels - Clearway Construction ($1,265,500)
  • General Contractor for York Street Park in Central Waterfront - Somerville Construction ($10,283,000)
     

June

  • Accessibility Framework for Waterfront Wide Initiative - Quadrangle Architect ($160,998)
  • Procurement Advisory Services for Waterfront Toronto - Jevin and Associates ($3,000 per week as and when required) (Sole Source)
  • Project Management, Design Review, Engineering, Third Party Inspection and Audit Services for Relocating/Reinstating Toronto Hydro Infrastructure - Toronto Hydro Electric System ($257,660) (Sole Source)
  • Hydraulic Modeling Peer Review (3rd Party) for Port Lands Flood Protection Project - W.F. Baird & Associates ($145,864)
     

May

  • Corporate Reputation Assessment and Tracking Services - Forum Research Inc. ($127,805)
  • Utility Relocation Legal Fees for CreateTO Easements - Weirfoulds LLP ($60,300) (Sole Source)
     

March

  • Construction of In-Water Pipes and Boardwalk in East Bayfront – Clearway Construction Inc. ($15,775,000)
     

February

  • Promotion Strategy for Quayside Development Opportunity Request for Qualifications (RFQ) (Ontario's Agency of Record #ARB Tender 13193) – DAY Communications Group Inc. ($50,000)
  • Queen's Quay East Extension and Cherry Street - LRT Road, and Public Realm Design Services in East Bayfront – Stantec Consulting Ltd. ($9,955,611) 
  • Advisory Services for Natural Gas Pipeline Design in Lower Don Enbridge Gas Main Location – R.V. Anderson Associates Ltd. ($75,000)
     

January

  • Redesign of Waterfront Toronto’s Website and Blog – OPIN Digital Inc. ($418,768)
  • Sub-Surface Utility (SUE) Investigations for Queen's Quay East in East Bayfront – Onsite Locates Inc. ($66,000)
  • Indigenous Public Art Curator – Ryan Rice ($81,250)
  • Legal Services for Quayside Development – McCarthy Tetrault LLP ($351,100)
  • Environmental Advisory Services for 3 years from January 11, 2021 to March 31, 2024 – Meggen Janes ($2,400 per week as and when required)(Sole Source)
Answer

December

  • Engineering and Cost Estimating Services – Infrastructure Due Diligence for Quayside Development – WSP Canada Inc ($264,980)
     

November

  • Financial Subject Matter Expert for Quayside Development – KPMG LLP ($193,398)
  • Legal Services – Procurement Matters for Quayside Project – Dentons Canada LLP ($120,000)
  • Interim Senior Legal Counsel Services – Axiom Global Canada ($107,000) (Sole Source)
  • Commissioners Street Abandonment – Phase 3 (Section in front of 39 Commissioners Street) – Enbridge Gas Distribution ($83,055) (Sole Source)
     

September

  • Quayside Fairness Advisory Services – McLachlin Enterprises Inc
     

August​

  • Support for the Working Group and Engagement regarding Toronto’s waterfront – Mississaugas of the Credit First Nation ($245,000) (Sole Source)
  • Initial review of the Master Plan, Innovation Plan, and Development Plan to Identify various options that can be advanced between Waterfront Toronto and MCFN – Mississaugas of the Credit First Nation ($89,250) (Sole Source)
  • Advisory Services for Minimum Green Building Requirements (Version 3) – Moriyama & Teshima Architects ($144,040)
  • Quayside Project Management – Tablino Consulting Inc. ($302,962.50) (Sole Source)
     

July


  • Purchase of Palo Alto Cortex XDR for 3-years from July 27, 2020 to July 26, 2023 – Herjavec Group Inc. ($151,160) 
  • Relocation Work - Design for Permanent Servicing Villiers Island – Enbridge Gas Distribution ($169,242) (Sole Source)
  • Supply of Topsoil – Parks, Rivers, and Roads for Port Lands Flood Protection Project – Hermanns Contracting Ltd. ($6,046,024) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Toronto Hydro Relocation for Port Lands Flood Protection Project – Powerline Plus Ltd. ($2,304,500) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
  • Remediation of PCB Impact – 3C Property for Port Lands Flood Protection Project – Wood Environment & Infrastructure Solutions ($130,950) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
  • West Plug Cut-Off Walls for Port Lands Flood Protection Project – Keller Foundations ($18,035,563) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
  • Fire Hall Temporary Sanitary Services – Commissioners Street for Port Lands Flood Protection Project – Plan Group ($90,000) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
  • Field Liaison Representatives Monitoring of the Environmental and Archaeological Work for the Port Lands Flood Protection Project – Mississaugas of the Credit First Nation ($144,300) (Sole Source)
     

June

  • Professional Surveying Services – Queen’s Quay East – Callon Dietz Ontario Land Surveyors ($95,735)
     

May

  • Water Connection to Stormwater Facility – City of Toronto ($75,535) (Sole Source)
  • Design Competition – Rees Street Park – wHY Architecture ($900,000)
     

April

  • Re-imbursement for License Agreement Fees – Menkes Waterfront Holdings ($147,581) (Sole Source)
  • Palo Alto PA-850 firewall with three-year subscription services and support from May 13, 2020 to May 12, 2023 – Herjavec Group ($96,079)
  • Bayside Phase 2 Local Streets - Edgewater Drive (Phase 2) Cost Contribution Agreement & Kanadario Lane Cost Contribution Agreement – Aquabella Bayside ($2,705,555) (Sole Source)
     

March

  • Legal Services regarding Canadian Civil Liberties Association (CCLA) litigation – Borden Ladner Gervais LLP ($750,000)
  • Technical and Functional Support of Microsoft ERP Dynamics 356 – Thinkmax Consulting Inc. ($65,000) (Sole Source)
  • Oil Pipeline Abandonment for Port Lands Flood Protection Project – R.B. Somerville ($400,000) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
  • Cherry Street South and Commissioners Street Bridge Substructure and Concrete Works for Port Lands Flood Protection Project – Verdi Alliance ($8,751,178)(Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Supply of Revetment and Riverbed Stone for Port Lands Flood Protection Project – Roman Building Materials ($8,021,824) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Polson Slip Revetment Stone Supply and Install for Port Lands Flood Protection Project – McNally ($4,817,750)(Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
     

February

  • Temporary Replacement for a Senior Systems Administrator Role – Randstad ($72,200) 
  • Design Services for Destination Playground – Michael Van Valkenburgh Associates ($164,460)
  • Hydro Relocation of Existing Electrical Service to Sugar Beach – Menkes Waterfront Holdings ($149,904) (Sole Source)
  • License Arrangement to complete work in Ports Toronto waterlots – Ports Toronto ($1,000,000) (Sole Source)
  • Queen's Quay East 30% PDE Project – DTAH West8 ($297,867)
  • Supply and Installation of Switches and Network Access Control – Zycom Technology Inc. ($83,339)
     

January 

  • Strategic Communications Services for Auditor General of Ontario's Value-for-Money Audit – Counsel Public Affairs ($77,000) 
  • Site Preparation & Removals Phase III for Port Lands Flood Protection Project – Priestly Demolition Inc ($4,104,368) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Building Demolition Phase III for Port Lands Flood Protection Project – JMX Demolition and Environmental Contractors ($752,191) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Excavation, Soil Management, and Rough Grading Barrier for Port Lands Flood Protection Project – QM Environmental ($84,209,872) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Dewatering, Excavation, and Barrier Systems for Port Lands Flood Protection Project – QM Environmental ($26,394,928) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto) 
Answer

December

  • Preliminary Human Rights Assessment of the Amended MIDP – Element AI Inc. ($202,761)
  • Cherry Street Lakefilling Project License Fee from November 2019 to March 2020 – Ports Toronto ($185,685) (Sole Source)
  • River Valley Plant Supply for Port Lands Flood Protection Project – St. Williams Nursery ($1,182,930) & Sassafrass Farms ( $169,204) (Contracts awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Fundraising Legal Services – Carters Professional Corporation ($75,000)
  • Temporary Replacement for Senior Systems Administrator Role – Randstad ($72,200)
  • Construction of Ground Consolidation Test Pad for Port Lands Flood Protection Project – Priestly Demolition Inc ($193,825) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Tree and Rootwad Supply for Port Lands Flood Protection Project – Aldershot Landscaping ($1,963,545) & Caledon Treeland ($248,977) (Contracts awarded by Elles Don Civil Ltd on behalf of Waterfront Toronto)
  • Fire Hall Heritage Building Relocation for Port Lands Flood Protection Project – Heritage Restoration Inc ($1,861,000) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Advisory Services for Social Responsibility and Sustainability Report – The Works Design Communications ($51,716)
     

November

  • Interim Project Management Support Services for Stormwater Facility and In-Water Pipes – Colliers Project Leaders ($108,171) (Sole Source)
  • Atlas Crane Test Pit Excavation for Port Lands Flood Protection Project – GLF Infrastructure ($99,758) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Fundraising Advisory Services – Ketchum Canada (2002) Inc. ($97,500)
  • Field Liaison Representatives for Archeological Monitoring and Fisheries Monitoring – Mississaugas of the Credit First Nation ($463,883) (Sole Source)
     

October

  • Painting Services for Waterfront Reconnect Project – Harrison Muir Inc (120,634)
  • Legal Services – Expropriation of 39 Commissioners Street Lease – Borden Ladner Gervais LLP ($55,000)
  • Waterfront Walk Advancement – DTAH West 8 ($109,891)
  • Port Lands Flood Protection Project – Traffic Signal Installation (Villiers Street) – Guild Electric Ltd ($323,300) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Building Demolition for 130 Commissioners Street for Port Lands Flood Protection Project – Priestly Demolition Inc ($327,478) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Interim Project Management Office Support Services – Colliers Project Leaders ($64,000) (Sole Source)
  • Port Lands Flood Protection Project – Cut Off Walls Phase II – GLF and Geo Solutions Joint Venture (GFL/GSI) ($29,313,489) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Microsoft Volume Licensing from October 01, 2019 to September 30, 2022 – Microsoft Corporation ($167,641)
  • Office Renovations for 20 Bay Street – Govan Brown and Associates Ltd ($335,959)
     

September

  • Port Lands Flood Protection Project – Gas Main Relocation (Saulter Street and Villiers Street) – Enbridge Gas Distribution Inc ($540,343) (Sole Source)
  • Grants and Funding Support Services – The Funding Portal ($120,000)
  • Cherry Street Stormwater Facility – Offer to Connect – Toronto Hydro Electric Systems ($197,481.57) (Sole Source)
  • Port Lands Flood Protection Project – Cherry Street South/Commissioners Street (Bridge Foundations) – GFL Infrastructure Group ($7,928,565) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Port Lands Flood Protection Project – Road Construction (Saulter Street and Villiers Street) – Sanscon Construction ($849,969) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Provide Legal Services as Acting General Counsel – Axiom Global Canada Inc. ($150,800) (Sole Source)
  • Temporarily Relocate Bell Structure Along Commissioners Street – Bell Canada ($245,412) (Sole Source)
     

August

  • Design and Construction of Hydro One Towers relocation – Hydro One Networks Inc. ($2,816,000) (Sole Source)
     

July

  • Cherry Street North Bridge – Substructure and Concrete Work – Belor Construction ($3,381,324.10) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Photography Services for Port Lands Flood Protection Project – Vid Ingelevics ($150,000)
  • Public Realm Review: Urban Design – Subject Matter Expert – Perkins + Will ($106,995)
  • Economic Development Review – Subject Matter Expert – Steer Davies Gleave North America Inc. ($136,547)
  • Compensation for the temporary relocation of a Bell Structure to allow for construction along Commissioners Street – Bell Canada ($74,544) (Sole Source)
  • Water Treatment Services for Port Lands Flood Protection Project – Accuworx Inc. ($27,098,792) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Dewatering, Excavation, and Barrier System for Port Lands Flood Protection Project – QM Environmental ($26,394,928) (Contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
     

June

  • Legal Services for Land Transactions (Ports Toronto) – Stikeman Elliott LLP (TBD)
  • Marine Strategy Update and Implementation Plan – WSP Canada Group ($218,093)
  • Dell Compellent Services and Post-Standard Support – Dell Canada ($60,574)
  • Interim Use of Waterfront Toronto Owned Properties (Parking Management Services) – Target Park Inc.
  • Computer Hardware Supply – Beartech Solutions ($53,687)
  • Initiate and provide immediate design reviews to advance permanent connections and relocations – Toronto Hydro Electric Systems ($350,000) (Sole Source)
     

May

  • Cherry Street North Bridge Test Pile (O-Cell) for Port Lands Flood Protection Project – Soletanche Bachy Canada ($456,100) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Geotechnical Monitoring (Cherry Street and WP3 Cut Off Walls) for Port Lands Flood Protection Project – EXP Services Inc ($1,309,900) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Buildings Review: Architectural – Subject Matter Expert – Moriyama & Teshima Architects ($153,845)
  • Planning Review: Urban Planning & Development – Subject Matter Expert – Gladki Planning Associates Inc. ($69,375)
     

April

  • Bonnycastle Street – Road Reconstruction and Public Realm Phase I – UCC Group Inc. ($1,471,164)
  • Streetscape Improvements – 800 Fleet Street and Garrison Road – CSL Group Ltd. ($243,850)
  • Loss of Parking Stall and Revenue – Great Gulf (Downtown Properties) Ltd ($55,000) (Sole Source)
  • Conceptualization and Execution of a Video Series for the Public Audience – Bespoke Cultural Collective ($77,501)
     

March

  • Construction Manager for Lakefilling Revenue – EllisDon Civil Ltd ($115,050)
  • Design Competition for York Street Park – Claude Cormier et Associes Inc ($1,067,500)
  • Cut-Off Walls Phase I for Port Lands Flood Protection Project – GFL & Geo Solutions ($41,828,224) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Building Demolition Phase II for Port Lands Flood Protection Project – Priestly Demolition Inc ($3,043,728.50) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Cherry Street North Bridge Foundation and Sheet Piling for Port Lands Flood Protection Project – Soletanche Bachy Canada ($5,812,007) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Laboratory and Testing (Roads and Bridges) for Port Lands Flood Protection Project – Golder Associates Ltd (3,579,797) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Crisis Communications Planning and On Call Support for Waterfront Toronto – Hill+Knowlton Strategies ($50,000) 
  • Master Innovation and Development Plan: Housing Pillar, Subject Matter Expert – N. Barry Lyon Consultants Ltd. ($64,970)
  • Public Engagement Strategy and Execution for Quayside Project – Swerhun Inc ($184,525)
  • Realty Taxes (2018) for 255 Queens Quay East – City of Toronto ($79,55)
     

February

  • Dockside Public Realm Design Update – DTAH West 8 ($53,049) 
  • Ground Improvements for Cherry Street Lakefilling Project – Various Sub-Contractors ($564,373) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Bridges Steel Superstructure for Port Lands Flood Protection Project – Cherubini Metal Works Ltd ($47,430,365) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Time Lapse/Project Management Cameras for Port Lands Flood Protection Project – CEECAM ($57,363) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Order of Magnitude Financial Review for Quayside – N. Barry Lyons Consultants Limited ($50,125) (Sole Source)
  • Toronto Hydro Equipment relocation from Sherbourne Common to Monde (Parkside) – Toronto Hydro Electric System Limited ($505,734) (Sole Source)
     

January

  • Strategic Communications Services for Auditor General of Ontario's Value-for-Money Audit – Counsel Public Affairs ($77,000) 
  • Facilitate Development of Film Studio and Production Space at 915 & 9145 Lake Shore Boulevard East – CreateTO ($5,000,000) (Sole Source)
  • Social Finance Strategy for Carbon Reductions - MaRS Descovery District ($91,583)
Answer

December

  • Hydroseeding, Landscaping, and Planting for Cherry Street Lakefilling Project – Aldershot Landscaping ($1,455,000) (contract awarded by EllisDon Civil Ltd on behalf of of Waterfront Toronto)
  • Dredging (Interim) – Ports Toronto ($180,460) (Sole Source) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
     

November

  • Executive Search Firm – BESC Toronto Inc. ($98,000)
  • Legal Services for LPAT – Ritchie, Ketcheson, Hart, & Biggart LLP (TBD)
     

September

  • Independent Capital Project Monitoring and Assurance Services – BTY Consultancy Group Inc. ($308,760)
  • Legal Services for Privacy and Data Protection Matters – Dentons Canada LLP ($221,000)
  • Subgrant Transfer Agreement – Ryerson University ($118,300) (Sole Source)
  • Aquabella Soil Contaminate Cost – Aquabella Bayside Toronto Inc. ($2,308,000)
  • Aitken Place Park – General Contractor – UCC Group Inc ($3,288,876)
  • Turbidity and Surface Water Quality Monitoring for Port Lands Flood Protection Project – WSP Canada Incorporated ($1,570,497) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
     

August

  • Edgewater Drive Cost Contribution Agreement – Aquavista Bayside Toronto Inc. ($1,877,562)
  • Engineering and Construction Services for Port Lands; City Design and Approval Input/Inspection – City of Toronto ($3,000,000) (Sole Source)
  • Realty Tax (2015-2017) for Bayside Sale Pavilion and Parking Lot – City of Toronto ($471,572) (Sole Source)
  • Fish Gates for Cherry Street Lakefilling Project – International Erosion Control System Incorporated ($208,598) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Demotion, Site Prepartion, and Shallow Excavation for Port Lands Flood Protection Project – Priestly Demolition ($3,345,391) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
     

July

  • Peer Review - Risk Management Measures for Port Lands Flood Protection and Enabling Infrastructure Projects – Geosyntec Consultants International Inc. ($279,960)
  • Construction of Cherry Street Stormwater Facility and Sewage Pumping Station – Graham Construction and Engineering LP ($19,840,905)
  • Environmental Peer Review of the Port Lands – City of Toronto ($132,743) (Sole Source) 
  • Supply and Armour Stone and Rip Rap for Cherry Street Lakefilling Project – Metrix Group ($3,030,941) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Noise Vibration Monitoring for Port Lands Flood Protection Project – WSP Canada Incorporated ($493,000) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Weather and Odor Monitoring for Port Lands Flood Protection Project – WSP Canada Incorporated ($2,181,243) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
     

June

  • Legal Services –  Quayside and Sidewalk Toronto – McCarthy Tétrault LLP ($350,000)
  • Dockside – Block 1 Dockwall Reinforcing at East Side of Jarvis Slip  – Somerville Construction ($1,260,214)
  • Trailer Complex and Site Office Furniture for Port Lands Flood Protection Project – Modspace/Barry's Furniture ($1,064,980) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
     

May

  • Bayside Child Care Centre  – Architect and Lead Consultant – CS&P Architects Inc. ($202,500)
  • Development of Five Year Business Plan – KPMG LLP ($284,603)
  • Labratory and Testing for Cherry Street Lakefilling Project – Englobe Corporation ($871,936) (contract awarded by EllisDon Civil Ltd on behalf of Waterfront Toronto)
  • Dock Wall Management Pilot Project Yonge St. Slip – East Side  – York Bay Marine Services Inc. and Toronto Island Transit Services Inc. JV
     

April

  • Port Lands Flood Protection and Enabling Infrastructure Project – Program Management Services – Colliers Project Leaders ($10,461,118) 
  • Executive Search Firm – Odgers Berndston Canada Inc.($55,000)
  • Quayside Innovation Partnership - Legal Advice - Dentons Canada LLP ($100,000)
  • Marine Contractor for Cherry Street Lakefilling Project – McNally International ($6,505,030) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Earth Works Contractor for Cherry Street Lakefilling Project – GFL Infrastructure ($1,856,030) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Benchmark and Topographic Survey for Cherry Street Lakefilling Project – J&R Surveys (115,440) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Geotechnical Instrumentation and Monitoring for Cherry Street Lakefilling Project – SNC Lavalin ($659,564) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Noise and Vibration Monitoring for Cherry Street Lakefilling Project – Valcoustics Canada ($113,560) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Internal Confinement Berm for Cherry Street Lakefilling Project – GFL Infrastructure ($557,405) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Core Stone Pre-Purchase & Delivery for Cherry Street Lakefilling Project – H.R. Doornekamp Construction ($12,202,226) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Core Stone Pre-Purchase & Delivery for Cherry Street Lakefilling Project – Southwestern Sales ($251,042) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Subsurface Utility Engineering for Port Lands Flood Protection Project – T2 Utility Engineering ($1,338,896) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Land Surveying Services for Port Lands Flood Protection Project – Callon Dietz Incorporated ($585,750) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Tree Cutting and Removal for Port Lands Flood Protection Project – Bevcon Construction ($207,770) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
     

March

  • Bridge Design & Engineering Services for Port Lands Flood Protection – Entuitive Corporation ($12,679,726)
  • Rethinking How We Live in the Great Golden Horse Region – George Brown College ($50,000)
  • Audio/Video Retrofit for Corporate Meeting Rooms  – Advanced Presentation Products Inc.($147,848)
     

February

  • Computer Refresh & Peripherals – Beartech Solutions Inc. ($99,541)
  • Cost Consulting Services – Altus Group Ltd ($716,100)
     

January​

  • Road Design and Civil Engineering Services for Port Lands Flood Protection – WSP Canada Group Limited. ($8,709,123)
  • Supply and Installation of Dockwall for Cherry Street Lakefilling Project – Bermingham Foundation Solution ($12,685,214) (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
  • Supply of Fill for Cherry Street Lakefilling Project – GFL Environmental (contract awarded by Ellis Don Civil Ltd on behalf of Waterfront Toronto)
Answer

December

  • IT Systems Analyst Position – Nexus Systems Group Inc. ($82,875)
     

November

  • Project Coordination Services for Cherry Street Stormwater & Lakefilling Project – Toronto Port Lands Company ($125,000) (Sole Source)
  • Risk Governance Advisory and Internal Audit Services – MNP LLP ($179,400)
     

October

  • Peer Review Support, Evaluate and Advice on Review Process of Port Lands Flood Protection and Enabling Infrastructure Project Implementation Plan – Rijswaterstaat Room for the River ($94,237) (Sole Source)
  • Hosting of Microsoft Dynamics 365 Software for three (3) years via Microsoft Cloud Solution – Microsoft Corporation ($174,808) (Sole Source)
  • Jack Layton Ferry Terminal & Harbour Square Park – Phase 1A Landscape – Rutherford Contracting Ltd. ($1,854,725)
  • Port Lands Flood Protection and Enabling Infrastructure - Construction Manager - EllisDon Civil Ltd. ($858,000,000 including construction trade packages)
     

September

  • Port Lands Area – Soil & Groundwater Remediation and Treatment Technologies – Part B: Field-Scale Pilot Testing:
    • Ethical Solutions - surfactant enhanced injection combined with chemical oxidation technology ($278,100)
    • Geosyntec Consultants – demonstration of self-sustaining smouldering remediation in both in-situ and ex-situ environments technology ($869,110)
    • Groundwater Technology BV - in-situ biological cementation using urea-based solution to enhance geotechnical stability of soils technology ($313,022)
    • WSP Canada - Block and Absorb and Enhanced Aerobic Biodegration technology ($340,335)​​
  • Engineering and Inspection Fees for Services for Bayside Phase II – City of Toronto ($88,950) (Sole Source)
  • Legal Services to Assist with Board/Corporate Governance Matters – Axiom Global Canada Inc. ($52,000) (Sole Source)
  • Interior Design-Build Services for Waterfront Toronto’s Corporate Office – Greenferd Construction Inc. ($186,446)
  • East Bayfront Dockside Block 1 - Dockwall Reinforcing Design and Contract Administration – SNC-Lavalin Inc. ($173,082)
     

August

  • Offer to Connect for The Bentway – Toronto Hydro Electric System ($252,050) (Sole Source)
  • IT Disaster Recovery Services – Open Storage Solutions Inc. ($225,720)
  • Corporate Project Scheduling Consultant – Stantec Consulting Ltd. ($148,840)
  • Cloud Enterprise Resource Planning System – Thinkmax Consulting Inc. ($821,234)
     

July

  • Networking & Server Infrastructure for Waterfront Toronto – Technology Integration Group ($147,792)
  • Waterfront Toronto’s Data Centre Cooling Equipment & Maintenance Services – Modern Niagara Toronto Inc. ($78,400)
     

June

  • Cherry Street (formerly known as Essroc Quay) Lakefilling Design and Contract Administration Services – CH2M HILL Canada Ltd ($1,193,946)
  • East Bayfront Bayside Phase II – Public Realm, Municipal Services and Water’s Edge Promenade – General Contractor – Clearway Construction Inc. ($12,175,000)
     

May

  • Structural Concrete for The Bentway – UCC Group Inc. ($3,936,487) (contract awarded by Peter Kiewit Sons ULC on behalf of Waterfront Toronto)
  • Electrical Work for The Bentway – Guild Electric Inc. ($1,879,755) (contract awarded by Peter Kiewit Sons ULC on behalf of Waterfront Toronto)
     

April

  • Ice Refrigeration Equipment for The Bentway – CIMCO Refrigeration ($996,834) (contract awarded by Peter Kiewit Sons ULC on behalf of Waterfront Toronto)
  • Legal Services for Innovation Partnership for Quayside Sustainable Community Development - McCarthy Tétrault LLP ($90,000)
  • Development of Integrated Water Resource Evaluation Tool (IWRET) – Toronto and Region Conservation Authority ($74,550) (sole source)
  • Cherry Street Lakefilling (formerly known as Essroc Quay Lakefilling) Design & Contract Administration Services – CH2M HILL Canada Ltd ($1,193,946) 
  • Palo Alto Firewall Subscription Services for Waterfront Toronto – IntelliGo Networks Inc. ($86,476)
  • Operation and Maintenance of Sherbourne Common Pumping Station and UV Disinfection Facility - SNC-Lavalin Operations & Maintenance Inc. ($365,352)
     

March

  • Site Grading and Civil Utilities for The Bentway - Peter Kiewit Sons ULC ($3,346,645) (contract awarded by Peter Kiewit Sons ULC on behalf of Waterfront Toronto)
  • Public Artwork for Aitken Place Park in East Bayfront - Studio North Inc. ($300,000)
  • Sponsorship for Sugar Shack Festival 2017 – Water’s Edge Festivals & Events ($50,000) (sole source)
     

February

  • Water’s Edge Promenade Landscape Design for Central Waterfront – Pier 27 Toronto Inc. ($392,242) (sole source)
     

January

  • Watermain Connection for Bayside Phase 1 - Queens Quay East in the East Bayfront – Kenco Construction Ltd. ($392,700)
  • Executive Search Firm for Waterfront Toronto – W.P. Osborne Executive Search Inc. ($60,000)
  • Pre-Engineering and Costing Study – Bridge Connecting Exhibition Place with Ontario Place – DTAH ($199,475)
Answer

December

  • Essroc Quay and Polson Slip – Sediment, Soil and Bedrock Sampling and Testing – CH2M HILL Canada Ltd ($267,928)
     

November

  • Public Artwork for Aitken Place Park – Caitlind Brown & Wayne Garrett with Studio North Inc. ($300,000)

  • East Bayfront LRT Phase II Business Case Work Plan – Hatch ($50,000) (sole source)

  • The Bentway – Construction Manager – Peter Kiewit Infrastructure Co. ($17.8 Million including construction trade packages) 
     

October

  • Advisory Services for Quayside Redevelopment – Sustainable Systems and Technology – Arup Canada Inc. ($297,973)

  • Advisory Services for Quayside Redevelopment – Process, Financial Analysis and Transactions – KPMG LLP ($204,700)

  • IT Colocation Services – Cogeco Peer 1 (Canada) Inc. ($187,200)

  • West Don Lands Phase 1 – Gas Main Installation to Service Urban Capital Development Blocks at 210 Eastern Avenue – Enbridge Gas Distribution ($79,804) (sole source)
     

September

  • Connect Hydro at Bayside Phase II in the East Bayfront – Toronto Hydro Electric System ($265,487) (sole source)
     

August

  • Water Services for Parkside – Monde Development – Great Gulf (Downtown Properties) Ltd. ($50,146)

  • WT/Hines Project Management Agreement – East Bayfront Bayside Phase II – Hines Canada Management Company II ULC ($734,394)

  • Hydro Vault Room and Fit-Out for future Aitken Place Park – R3/R4 Building – Aquavista Bayside Toronto Inc. ($56,723)

  • Bayside Phase II – Advanced Works Dockwall Reinforcing (Part 1) – Eastern Construction Company Ltd. ($1,633,569)
     

July

  • Project: Under Gardiner (The Bentway) – Project Initiation Advisory Services – Artscape ($58,850) (sole source)  

  • Construction of Portland Slip – Sidewalk Extension – Somerville Construction ($191,242)
     

June

  • Proposal Peer Review of Port Lands Flood Protection and Enabling Infrastructure - Rijkswaterstaat Room For The River ($93,600) (sole source)
     

May

  • Dell Compellent Warranty and Support Services Renewal – Velocity Business Solutions ($54,683)

  • External Audit Services for Waterfront Toronto – BDO Canada LLP ($183,000)
     

April

  • Project: Under Gardiner – Design Team – PUBLIC WORK ($1,432,746) (sole source)

  • Project: Under Gardiner – Surveying Services - Callon Dietz Incorporated Ontario Land Surveyors ($106,405)
     

March

  • Toronto Book Garden – Entrance Sign and Engraved Granite Pavers – Mopal Construction Ltd. ($69,000)
     

February

  • Project: Under Gardiner – Communication Professional Services – Bespoke Cultural Collective ($105,200)(sole source)

  • Project: Under Gardiner – Open Space Programming, Operations, and Maintenance Governance Structure – HR&A Advisors Inc. ($130,813)

  • Project Management Information System (PMIS) Advisory Services – PMX Inc. ($90,900)
     

January

  • Dell Compellent Storage Refresh – Velocity Business Solutions ($54,903)

Answer

December

  • Project: Under Gardiner – Municipal Class Environmental Assessment – Dillon Consulting Ltd. ($112,855)
  • Project: Under Gardiner – ESA, Due Diligence, Brownfield Approvals and Geotechnical Investigation Services – Amec Foster Wheeler ($238,865)
  • East Bayfront Bayside Phase II – Design and Contract Administration Services – DTAH ($1,554,323)
  • Resiliency & Innovation Framework for Sustainability Consulting Services – Canadian Urban Institute ($95,147)
  • Municipal Class Environmental Assessment for Lower Yonge Precinct – MMM Group Limited ($815,792)
  • IT Senior Systems Analyst Position – PentaCan ($142,740)
     

October

  • Real Estate Development, Financial and Market Analyses Services – N. Barry Lyon Consultants Ltd. ($65,000)
     

September

  • Engineering and Inspection fee for the Linear Works of the External Servicing Project in the East Bayfront – City of Toronto ($527,852)(sole source)
  • Transportation and Municipal Engineering Services for East Bayfront Quayside – MMM Group Ltd. ($59,300)
  • Staff Position (Contract) – Lannick Contract Solutions Inc. ($83,807) 
     

August

  • Brokerage / Financial Advisory Services – Parking Concession – Ernst & Young Orenda Corporate Finance Inc. ($50,000 + Commission & Professional Fees) 
  • Port Lands - Scheduling, Risk Analysis and Quantification Services – HDR Corporation ($113,672)
  • Port Lands – Environmental, Geotechnical and Hydrogeological Strategy Development – CH2M HILL Canada Ltd. ($303,790)
  • Port Lands – Civil (Earthwork) Engineering Services - CH2M HILL Canada Ltd. ($132,515)
  • Port Lands – P3 / AFP Project Screening Services – Ernst & Young Orenda Corporate Inc. ($97,460)
     

July

  • Port Lands - Cost Estimating Services – Hanscomb Ltd. ($116,805)
     

June

  • Feasibility Study to Assess Effects of Don Mouth Naturalization and Flood Protection on Hydro One Infrastructure – Hydro One Networks Inc. ($150,000)(sole source)
  • Road Restoration for East Bayfront External Sanitary Sewer – City of Toronto ($879,246)(sole source)
  • Billy Bishop Toronto City Airport Peer Review – Proposed Runway Extension and Introduction of Jet Aircraft Study – Arcadis Canada Inc. ($93,115)
  • Port Lands – Environmental, Geotechnical & Hydrogeological Investigation – Conestoga-Rovers & Associates ($598,952)
     

May

  • Insured Repair of Damaged Silva Cells and Water Damages - Eastern Construction Company Ltd. ($329,506)
  • Supply and Installation of Check Valve for Bayside in the East Bayfront – Solderholm Marine Services Inc. ($71,940) (contract awarded by PCL Constructors Canada Inc. on behalf of Waterfront Toronto)
     

April

  • Construction and Site Preparation for Block 15 Public Art Site in Pan Am Athletes’ Village – Ontario Infrastructure and Lands Corporation ($72,068)(sole source)
  • Streetscaping Works on Woonerfs and St. Lawrence Street in the West Don Lands – Toronto Community Housing Corporation ($894,186)(sole source)
    Pavement Replacement for Sherbourne Common in the East Bayfront – Mopal Construction Limited ($138,200)
  • Innovative Design Competition for the Jack Layton Ferry Terminal and Harbour Square Park – KPMB Architects, West 8, Greenberg Consultants 
     

March

  • Design & Construction Administration Services (including Provisional Items) for Aitken Place Park in the East Bayfront – Scott Torrance Landscape Architects Inc. ($605,488)
     

February

  • Miscellaneous Metals for Bayside Sanitary Pumping Station in the East Bayfront – MRM Modern Railings & Metalcraft Limited ($197,438) (contract awarded by PCL Constructors Canada Inc. on behalf of Waterfront Toronto)
  • Specialized IT Expertise – Robert Half Management Resources ($145,125)
  • Supply, Installation and Configuration of Citrix NetScalers for Waterfront Toronto – Gibraltar Solutions Inc. ($81,853)
  • Permanent Environmental Monitoring Wells for Bayside in the East Bayfront – Geo-Environmental Drilling Inc. ($59,383) (contract awarded by PCL Constructors Canada Inc. on behalf of Waterfront Toronto)
     

January

  • Construction of Martin Goodman Trail West (Yo Yo Ma Lane to Stadium Road) – Grascan Construction Ltd. ($2,380,464)