Appendix 19: Appendix E: Detailed Project Schedule (HDR) Read more about Appendix 19: Appendix E: Detailed Project Schedule (HDR)
Appendix 18: Conceptual Cost Estimates (Hanscomb) Read more about Appendix 18: Conceptual Cost Estimates (Hanscomb)
Appendix 17: Executive Summary: Recommendations and Rationale for Construction Cost Escalation Factors (Hanscomb) Read more about Appendix 17: Executive Summary: Recommendations and Rationale for Construction Cost Escalation Factors (Hanscomb)
Appendix 16: 2015 Dockwall Structural Assessment Lower Don Lands (Riggs) Read more about Appendix 16: 2015 Dockwall Structural Assessment Lower Don Lands (Riggs)
Appendix 15: Marine Engineering Services to Develop Preliminary Designs for Land Creation Works Surrounding Essroc Quay (Riggs) Read more about Appendix 15: Marine Engineering Services to Develop Preliminary Designs for Land Creation Works Surrounding Essroc Quay (Riggs)
Appendix 14: Figures to Accompany CH2M Reports Read more about Appendix 14: Figures to Accompany CH2M Reports
Appendix 13: Environmental Cost Estimate (CH2M Report I) Read more about Appendix 13: Environmental Cost Estimate (CH2M Report I)
Appendix 12: Earthworks Methodology (CH2M Report H) Read more about Appendix 12: Earthworks Methodology (CH2M Report H)
Appendix 11: Preliminary Groundwater Management Plan (CH2M Report G) Read more about Appendix 11: Preliminary Groundwater Management Plan (CH2M Report G)
Appendix 10: Integrated Soil Management Plan (CH2M Report F) Read more about Appendix 10: Integrated Soil Management Plan (CH2M Report F)