Design Review Panel Meeting - November 15, 2017
A meeting of the Waterfront Design Review Panel where project updates were provided on: Rekai Centre and Options for Homes; and Port Lands Flood Protection Enabling Infrastructure.
Don Mouth Naturalization Becomes a Reality
POSTED: AUGUST 23, 2017 I ECONOMIC DEVELOPMENT, INFRASTRUCTURE, SUSTAINABILITY, PARKS & PUBLIC SPACES, TRANSPORTATION
BY: MIRA SHENKER