Built to Weather the Storm: The Cherry Street Stormwater Management Facility
POSTED: JUNE 10, 2020 I DESIGN, INFRASTRUCTURE, SUSTAINABILITY
By: Kaleigh Wisman
In order to create vibrant and sustainable places along Toronto’s waterfront, essential infrastructure is needed. Things like sewers and watermains may not sound exciting yet they set the ground (sometimes literally) for vibrant communities to take root.
Design Review Panel Meeting - December 11, 2019
A meeting of the Waterfront Design Review Panel where project updates were presented on: West Don Lands Block 20; East Bayfront Boardwalk and In-Water Pipes; George Brown College's The Arbour; and York Street Park (Love Park).
Design Review Panel Meeting - October 23, 2019
A meeting of the Waterfront Design Review Panel where project updates were presented on: East Bayfront Boardwalk and In-Water Pipes; and the Outer Harbour Rowing Facility.