Search Results
Sort By:
Laying the Foundations for a Sustainable and Resilient Waterfront
Search/Meta description
This is the second blog in our three-part series about our 2021-22 Integrated Annual Report. In this blog, read more about how we are ensuring the long-term environmental sustainability of
Indigenous Public Art is coming to the West Don Lands!
Search/Meta description
We’re planning for two exciting new public art pieces in the West Don Lands, one will be on the triangle of land formed by the intersection of King, Queen and River Streets, and one on the plaza of
Limberlost Place: Leading the Mass-Timber Movement
Search/Meta description
Limberlost Place is a new building on Toronto’s waterfront that will become one of Ontario’s first institutional mass-timber tall-wood buildings.
Extending the Waterfront East LRT to Villiers Island
Search/Meta description
Waterfront Toronto is working closely with the City of Toronto and the TTC to complete the Waterfront Transit Network, linking the Central Waterfront, East Bayfront, West Don Lands, Lower Don Lands
Something big and ambitious is happening at Quayside
Search/Meta description
Quayside is an L-shaped area on Toronto’s downtown waterfront about the size of six soccer fields. And in this small space something big and ambitious is happening. Our vision for Quayside reflects
Fueling Appetites and Small Businesses with Interim Events
Search/Meta description
This past summer, we initiated our Interim Use and Events Strategy by inviting Smorgasburg — the largest weekly open-air food market in North America — to activate a parking lot at the foot of Yonge
Creating an Accessible Waterfront
Search/Meta description
The transformation we have led on the waterfront has always met or exceeded accessibility rules. As always, our goal is to not just follow the rules but lead the way. Read about how we want to enhance
A Complete Community Supporting Olympic Excellence
Search/Meta description
In July 2024, Waterfront Toronto had the pleasure of speaking with Olympic athlete, Micha Powell. Learn more in this blog.
Sustainable Skyline: How Mass Timber is Shaping Toronto’s waterfront
Search/Meta description
Mass timber construction is becoming increasingly popular as a sustainable alternative to traditional building materials. Although its contemporary use in building construction is fairly recent, it
Advancing Quayside Through The Planning Approvals Process
Search/Meta description
Plans for Quayside are going through the planning approvals process before construction starts. What are those approvals and how will they help create a new dynamic, inclusive and resilient waterfront