Design Review Panel Meeting - April 13, 2016
A meeting of the Waterfront Design Review Panel where a presentation was given on the Block R5 Bayside development project.
Associated Links
Net Zero Energy Dwelling (NetZED) On The Waterfront
The revitalization plan for Toronto’s waterfront positions the city as a leader in creating sustainable communities, with some of the greenest buildings and neighbourhoods in the world.
POSTED: MARCH 22, 2016
BY: ANNA PALAMARCHUK
Design Review Panel Meeting - November 18, 2015
A meeting of the Waterfront Design Review Panel where project updates were presented on: R3/R4 Bayside (Aquavista); and the Waterfront Innovation Centre.
Associated Links
A Major Milestone for East Bayfront: Aqualina at Bayside
Toronto Mayor John Tory stands on the Water’s Edge Promenade at the Bayside construction site along with Deputy Mayor Pam McConnell, Hines’ Avi Tesciuba and Tridel’s Leo DelZotto.
POSTED: JUNE 6, 2015
BY: MIRA SHENKER
Groundbreaking for Aqualina - The First Building at the Bayside Toronto Development
May 22, 2015, Toronto, ON— Toronto Mayor John Tory, Deputy Mayor Pam McConnell, Waterfront Toronto’s Vice President, Development Meg Davis, Hines Country Head Avi Tesciuba, Tridel President Leo DelZotto, and Artscape CEO Tim Jones gathered to break ground on the first of eight buildings in the 13-acre Bayside Toronto development, a mix of residential, employment, cultural and commercial space that will change the face of the waterfront.